  • Case Study – Numatic (VAC B) – October 2009

    Project Aims

    The project was aimed at improving the layout, organisation and labour balance on the VAC B production line, where the company’s famous Henry vacuum cleaner is produced. The driver for the project is that the product continues to grow in popularity, and ...

    Published at: 10-09-2019
    Continue Reading
  • Case Study – Numatic (VAC A) – November 2009

    Project Aims

    The project was aimed at improving the layout, organisation and labour balance on the VAC A production line, where the company’s range of ‘wet’ vacuum cleaners are produced. The driver for the project is that the products are gaining in popularity and demand is growing as a result, ...

    Published at: 17-09-2019
    Continue Reading
  • Case Study – Sunseeker – October 2011

    Project Aims

    The final stage of boat manufacture, Clean and Finish, was proving to be a bottleneck in the process, and so the aim of the project was to improve the physical areas and associated processes to reduce the time and manpower currently invested ...

    Published at: 20-09-2019
    Continue Reading
  • Case Study – Numatic (Mould Shop) – July 2014

    Project Aims

    The project was aimed at ensuring that press shut-down procedures were established to ensure that electricity was not being wasted, which would both save money and improve the businesses...

    Published at: 30-09-2019
    Continue Reading
  • Case Study – Relyon – September 2009

    Project Aims

    The business urgently needed to increase production of its ‘Open Top’ mattress product line, without increasing labour cost or investing in new facilities. The aim of the improvement project was therefore to find a way of achieving this aim at its production ...